Singapore New Thomson-East Coast MRT Line

Lintec and Linnhoff Concrete worked with a major Readymix Concrete (RMC) Supplier to supply a Eurotec CIP12 (12 Tons/hour output) Chilled Water Plant and a WST2 (50 Tons storage capacity) Storage Tank for the client’s new Upper Changi-based batching plant. The plant will supply temperature-controlled concrete for the new Mass Rapid Transit (MRT) Thomson-East Coast Line and other local construction projects.

Eurotec’s Chilled Water Plants are designed for regions with tropical and hot climates, ideal for Singapore’s weather. They produce 1°C and 5°C chilled water using an Evaporative Condenser. The Eurotec chilled water plant was selected following positive reviews from other RMC suppliers in Singapore.

Related projects