East Coast Integrated Depot
Lintec and Linnhoff Concrete supplied a new Eurotec Chilled Water Plant CIP10 (10 Tons/hour output) Chilled Water Plant and 2 units of WST2 (50 Tons storage capacity) Storage Tanks to produce temperature-controlled concrete for high strength mixed concrete meant for the Integrated Depot.
East Coast Integrated Depot is an integrated multi-level Mass Rapid Transit (MRT) and Bus depot facility. It will serve the East West Line (EWL), Downtown Line (DTL) and the Thomson-East Coast Line (TEL), integrated with a bus depot. It houses three train depots and one bus depot in a single 360,000 square metre site, touted as the first of its kind in the world. It will be able to house around 220 trains and 740 buses.