Model: Lintec CSD 3000 Containerised Asphalt Plant
Location: Malaysia
Duration: 2016
The project involved resurfacing the entire 5.54-km race track to 40-mm thickness. It required approximately 20,000 tons of hot mix asphalt with polymer-modified bitumen (PMB) specifically designed for hard braking fast corners under motor-racing conditions.