- Cambodia
Neak Loeung Bridge construction in Cambodia
We helped with the construction of the Neak Loeung Bridge – the longest bridge across the Mekong River in Cambodia that opened in April 2015. We deployed three units of ECO 50-60 concrete batching plants, an CIP5 chilled water plant and an WST2 storage tank from the Eurotec brand to produce high strength mixed concrete for the project. The plants were easily deployed on land and a floating barge – saving costs and meeting the specific needs of this challenging site.