Technologies

Project References

New Doha International Airport

Model: Linnhoff LH4000 Tower Asphalt Plant

Capacity: 300 –320 TPH (3% moisture)

Location: Qatar

There are 4 units of asphalt plants on-site producing hot mix asphalt for the new airport. The airport has two parallel runways. The first runway is 4,850-m long and is the longest runway in Western Asia and one of the longest runways in the world. The second runway, constructed as part of Phase Three (completed by 2015), is 4,250-m long.

Get in touch with Us