Sepang International Circuit Tracks Resurfacing

The project involved resurfacing the entire 5.54-km race track to 40-mm thickness. It required approximately 20,000 tons of hot mix asphalt with polymer-modified bitumen (PMB) specifically designed for hard braking fast corners under motor-racing conditions.

Related projects