Technologies

Project References

East Coast Integrated Depot

Model: Eurotec EICA240-10T Chilled Water Plant & ECWT50 Storage Tank

Location: Singapore

Duration: 2019

Lintec and Linnhoff Concrete supplied a new Eurotec Chilled Water Plant EICA240-10T (10 Tons/hour output) Chilled Water Plant and 2 units of ECWT50 (50 Tons storage capacity) Storage Tanks to produce temperature-controlled concrete for high strength mixed concrete meant for the Integrated Depot.

East Coast Integrated Depot is an integrated multi-level Mass Rapid Transit (MRT) and Bus depot facility. It will serve the East West Line (EWL), Downtown Line (DTL) and the Thomson-East Coast Line (TEL), integrated with a bus depot. It houses three train depots and one bus depot in a single 360,000 square metre site, touted as the first of its kind in the world. It will be able to house around 220 trains and 740 buses.

 

Get in touch with Us